Power storage device and method of manufacturing power storage device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10930898
APP PUB NO 20190140218A1
SERIAL NO

16180080

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power storage device includes an electrode assembly, an accommodation case accommodating the electrode assembly, an external terminal provided on an outer surface of the accommodation case, a collector terminal connecting the electrode assembly and the external terminal, and a welding portion connecting the collector terminal and the external terminal. The external terminal includes an opposed surface opposed to the outer surface and an outer surface located opposite to the opposed surface. The external terminal has an insertion hole extending from the opposed surface toward the outer surface and a step portion located around an opening in the insertion hole located on a side of the outer surface. The collector terminal includes a contact surface in contact with a surface of the step portion. The welding portion is formed to weld the surface of the step portion and the contact surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nemoto, Yuta Okazaki, JP 19 36

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 23, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 23, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00