Sample holder assembly for effective thermal conductivity measurement of pebble-bed in laser flash apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10928338
APP PUB NO 20190302044A1
SERIAL NO

15983593

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure provides a sample holder assembly for a laser flash apparatus for measuring a thermal conductivity of a pebble-bed, the assembly comprising: a tubular sample container configured to be mounted on a sample carrier tube for the laser flash apparatus, wherein the sample container has open top and bottom; a bottom disc disposed in the sample container to block the open bottom of the sample container and configured for delivering a laser from a laser flash unit of the apparatus to a pebble-bed; the pebble-bed packed on the bottom disc to a predetermined thickness; and a top disc disposed on the pebble-bed and in the sample container to block the open top of the sample container and configured for receiving heat from the pebble-bed to transfer the heat upward.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA INSTITUTE OF FUSION ENERGY169-148 GWAHAK-RO YUSEONG-GU DAEJEON 34133

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahn, Mu-Young Daejeon, KR 2 0
Cho, Seungyon Daejeon, KR 2 0
Ku, Duck Young Daejeon, KR 1 0
Lee, Youngmin Daejeon, KR 130 384
Park, Yi-Hyun Daejeon, KR 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 23, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 23, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00