Steel piston with metallurgically bonded bushing and method of manufacturing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10926330
APP PUB NO 20180236555A1
SERIAL NO

15880359

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A steel piston with a bushing applied to pin bore surfaces by laser cladding or laser additive manufacturing is provided. The bushing is formed of metal, such as bronze, and metallurgically bonded to the steel of the piston. Thus, the bushing cannot fail by rotating relative to pin bore surfaces. The bushing has a porosity ranging from 0.05% to 5%, based on the total volume of the bushing, and a thickness ranging from 0.07 mm to 6 mm. Since the metal is applied directly to the steel by laser cladding or laser additive manufacturing, the overall size of the piston is reduced, compared to typical pistons with a separate steel backed bushing, and the possibility of bushing rotation is avoided. The bushing also provides scuffing resistance and increased unit load capacity of the pin bore.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TENNECO INC500 NORTH FIELD DRIVE LAKE FOREST IL 60045

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Weinenger, Michael Southfield, US 33 108

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 23, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 23, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00