Method for reduction of interfacial stress accumulation between double side copper-plated layers and aluminum nitride substrate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10923621
SERIAL NO

16663358

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention uses a photolithography process and an electroplating process to perform. TAV copper filling and patterning of the fabrication of the double side copper-plated layers to plate the double side copper-plated layers in advance at the TAV through holes to serve as a stress buffer layer of the aluminum nitride substrates. Then the subsequent pattern designs of the copper-plated layers are customized. According to the simulation theory calculations, it is proved that the stress which accumulates on the short-side of the copper-plated layer of the aluminum nitride substrate with the asymmetric structure may be effectively reduced to facilitate the improvement of the reliability of the aluminum nitride substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NATIONAL CHUNG-SHAN INSTITUTE OF SCIENCE AND TECHNOLOGYTAOYUAN CITY 325

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Hong-Ting Taoyuan, TW 3 0
Kuo, Yang-Kuo Taoyuan, TW 16 8
Shih, Cheng-Hung Taoyuan, TW 46 85
Wu, Chun-Te Taoyuan, TW 81 354

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 16, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 16, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00