Runtime power table index adjustment for performance and power management

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10921876
APP PUB NO 20190332157A1
SERIAL NO

15963307

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Power and performance of a multi-core system is managed dynamically by adjusting power table indices at runtime. Runtime statistics is measured, when an application is executed on a first core of a first type at a first operating point (OPP) in a first time period, and on a second core of a second core type at a second OPP in a second time period. A controller estimates, based on the runtime statistics, a first pair of indices associated with a first OPP for the first core and a second pair of indices associated with a second OPP for the second core. During runtime, the controller incorporates the first pair of indices and the second pair of indices into power table indices; and determines, from the power table indices, selected indices associated with a selected OPP of a core of a selected core type for executing the application.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MEDIATEK INCNO 1 DUSING RD 1ST SCIENCE-BASED INDUSTRIAL PARK HSIN-CHU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, I-Cheng Hsinchu, TW 3 6
Chou, Shu-Hsuan Hsinchu, TW 7 86
Hsu, Jih-Ming Hsinchu, TW 21 200
Huang, Pei-Yu Hsinchu, TW 13 43
Lai, Chien-Yuan Hsinchu, TW 11 70
Lee, Ming Hsien Hsinchu, TW 6 25
Li, Yun-Ching Hsinchu, TW 12 46
Lu, Tai-Hua Hsinchu, TW 3 33

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 16, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 16, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00