Safety luer connection

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10920915
APP PUB NO 20170120029A1
SERIAL NO

15405837

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connection device has a male connector and a female connector. The female connector will only accommodate the dedicated male connector, thereby prohibiting a misconnection with the wrong male connector. In certain embodiments, a member prohibits male connectors, other than a dedicated male connector, from being inserted into the female connector. In certain other embodiments, a post prohibits male connectors, other than a dedicated male connector including a slot, from being inserted into the female connector. In still certain other embodiments, a series of prongs in the male connector and corresponding grooves in the female connector ensure the proper connection. Once the male connector is inserted and secured within the female connector, a fluid-tight seal is formed between the male connector and the female connector.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CAREFUSION 303 INC3750 TORREY VIEW COURT SAN DIEGO CA 92130

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Walborn, Jonathan Mission Viejo, US 35 473
Yow, D Gregory Wake Forest, US 10 710

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 16, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 16, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00