Pipe protector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10920909
SERIAL NO

16650127

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pipeline shield is formed of modular pipeline shield panels into a generally tubular shape to fittingly envelope a pipeline. Each panel is formed of a rectangular sheet of durable material formed or formable into an arcuate shape having longitudinal ribs projecting radially from a surface of the sheet and defining longitudinal valleys, and coupling means configured for secure assembly with other modular pipeline shield panels to form the pipeline shield. The pipeline shield reduces or prevents damage from impact or abrasion when the pipeline is lowered into a trench and buried. The longitudinal ribs may extend an entire length of the panel, or may be less than an entire length of the panel and longitudinally staggered to facilitate rolling of the pipeline in a roller cradle during installation. Drainage holes provide for drainage of liquid away from the pipeline or to provide a path for cathodic protection current.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
1552818 ONTARIO LIMITED1780 RIVERBEND ROAD LONDON ONTARIO N6K 0A5

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Connors, Geoff Weyman London, CA 9 35

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 16, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 16, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00