Electric drive dump truck

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10919395
APP PUB NO 20180251033A1
SERIAL NO

15756251

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electric drive dump truck travels by contacting, with trolley lines, power collection units configured to be moved up and down by lifting devices and receiving electrical power from the trolley lines. A position detection device is configured to detect a position of the electric drive dump truck; a vehicle speed detection device is configured to detect a vehicle speed of the electric drive dump truck; and a storage section is configured to store a position of the trolley lines and a time (hereinafter referred to as a moving-up time) until the power collection units contact with the trolley lines since the power collection units start moving up. A control device is configured to output a signal indicating that the power collection units can be moved up based on the position and vehicle speed of the electric drive dump truck, the position of the trolley lines, and the moving-up time.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI CONSTRUCTION MACHINERY CO LTDTOKYO JAPAN TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tsutsumi, Yoshiaki Tsuchiura, JP 13 64

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 16, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 16, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00