Metallized current collector devices and materials

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10916741
SERIAL NO

16049250

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Energy storage devices, battery cells, and batteries of the present technology may include a first current collector and a second current collector. At least one of the first current collector and the second current collector may be a non-metal current collector. The battery cell may include a seal between an edge region of the first current collector and an edge region of the second current collector. The seal may contact a first surface of the first current collector and a first surface of the second current collector. The battery cell may also include a metal material coupled with the non-metal current collector on a second surface of the non-metal current collector opposite the first surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STACKED ENERGY INC2380 BERING DRIVE SAN JOSE CA 95131

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Campbell, Christopher T San Jose, US 19 41
Chu, Andrew C Cupertino, US 28 892
Dafoe, Donald G San Jose, US 23 125
Nagai, Kenzo Fremont, US 9 36
Zeilinger, Tobias Palo Alto, US 11 43
Zeng, Qingcheng San Jose, US 41 161

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 9, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 9, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00