Integrated process for mesophase pitch and petrochemical production

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10913901
APP PUB NO 20190078023A1
SERIAL NO

16117702

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An integrated method for mesophase pitch and petrochemicals production. The method including supplying crude oil to a reactor vessel; heating the crude oil in the reactor vessel to a predetermined temperature for a predetermined amount of time; reducing asphaltene content in the crude oil by allowing polymerization reactions to occur in the reactor vessel at an elevated pressure in the absence of oxygen; producing a three-phase upgraded hydrocarbon product comprising gas, liquid, and solid hydrocarbon components, where the liquid hydrocarbon component comprises deasphalted oil and the solid hydrocarbon component comprises mesophase pitch; separating the gas, liquid, and solid hydrocarbon components; directly utilizing the liquid hydrocarbon component for petrochemicals production; and directly utilizing the solid hydrocarbon component for carbon artifact production.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KING ABDULLAH UNIVERSITY OF SCIENCE AND TECHNOLOGY4700 KING ABDULLAH UNIVERSITY OF SCIENCE AND TECHNOLOGY THUWAL 23955-6900

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ali, Ola Thuwal, SA 8 10
Dong, Xinglong Thuwal, SA 9 49
Han, Yu Thuwal, SA 163 1157
Mahfouz, Remi Thuwal, SA 21 7
Morales, Osorio Isidoro Thuwal, SA 3 14
Xu, Wei Thuwal, SA 934 8439

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 9, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 9, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00