Active probe powered through driven coax cable

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10908183
APP PUB NO 20190137542A1
SERIAL NO

16180561

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A novel coupling system may include a head-end circuit for coupling a probe via a cable to an instrument, delivering power to the probe over the cable while the cable carries signal(s) from the probe to the instrument. The head-end circuit may include a first terminal for coupling to the probe via a cable, and may further include a second terminal for coupling to the instrument. The head-end circuit may apply direct-current (DC) power to the cable, and may remove a DC voltage offset resulting from the applied DC power before a signal from the probe reaches the instrument. The head-end circuit may include a common node coupled to the first terminal, a current source coupling the common node to a supply voltage, and a voltage source coupling the common node to a second terminal that couples to the instrument.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NATIONAL INSTRUMENTS CORPORATION11500 N MOPAC EXPRESSWAY AUSTIN TX 78759

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Whittington, Mark Austin, US 17 573

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 2, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 2, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00