Self-limiting regenerative pumping element start stage for high speed centrifugal engine fuel pump and associated method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10907598
APP PUB NO 20190277233A1
SERIAL NO

16295418

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An engine fuel or pump system includes a centrifugal pump having an impeller for imparting energy to an associated fluid for an associated downstream engine fuel system. A regenerative start stage is in selective fluid communication with the pump. And ejector includes an inlet that communicates with the pump outlet and an outlet that communicates with the pump inlet. Further, a regulator valve is interposed between the pump outlet and the regenerative start stage that selectively regulates associated flow from the regenerative start stage. The associated method include directing flow from the centrifugal pump to a regenerative start stage in order to supply an associated downstream flow circuit. During low speed starting, a portion of the flow from the regenerative start stage is provided to an ejector that recirculates to an inlet of the centrifugal pump. Once the centrifugal pump provides a predetermined level of at least one of the flow and pressure requirements of the associated flow circuit, the method includes terminating flow from the regenerative start stage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EATON INTELLIGENT POWER LIMITEDDUBLIN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Clements, Martin A West Chester, US 33 202

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 2, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 2, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00