Interference coordination method, apparatus, and system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10903925
APP PUB NO 20190089473A1
SERIAL NO

16197177

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method includes: acquiring, by a second base station, time-frequency position information corresponding to cell key information of a first base station, where the time-frequency position information is used for determining a time-frequency position that is corresponding to the cell key information of the first base station and that is on a shared time-frequency resource, and the cell key information includes at least one of a cell-specific reference signal (CRS), a channel state indication-reference signal (CSI-RS), a physical broadcast channel (PBCH), and a synchronization signal. The method also includes performing, by the second base station, interference coordination on the first base station.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HUAWEI TECHNOLOGIES CO LTDHUAWEI ADMINISTRATION BUILDING BANTIAN LONGGANG DISTRICT SHENZHEN GUANGDONG 518129

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Xiao Shenzhen, CN 297 1535
Deng, Tianle Shenzhen, CN 76 370
Luo, Haiyan Shanghai, CN 122 444

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 26, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 26, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00