Frequency reference generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10903790
SERIAL NO

16886030

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An LC oscillator has a tank driver connected to cause a matched-resistance LC tank to oscillate. The LC tank has an inductor leg in parallel with a capacitor leg. The inductor leg has an explicit inductor having an implicit resistance level RL. The capacitor leg has an explicit capacitor having an implicit resistance level RC connected in series with an explicit resistor having an explicit resistance level RR, where RM=(RC+RR) is substantially equal to RL. The LC oscillator may have a non-trimmable LC tank and be part of a temperature-compensated frequency reference generator having standalone frequency adjustment circuitry that offers better than ±0.1% frequency accuracy (after single trim and batch calibration) over process, voltage, and temperature variations, and lifetime, which can serve as a low-cost replacement for a crystal oscillator for many applications.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NXP B VEINDHOVEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jin, Yanyu Eindhoven, NL 3 3
Liu, Maoqiang Eindhoven, NL 2 3
Verlinden, Jos Wachtendonk, DE 18 78

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 26, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 26, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00