Hardware storage device optimization

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10901841
APP PUB NO 20190196906A1
SERIAL NO

16287391

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and system for improving operation of a memory device is provided. The method includes detecting, via sensors, environmental factors affecting an operation of individual hardware storage devices within an array of hardware storage devices. The environmental factors are analyzed with respect to operational characteristics of the individual hardware storage devices and a resulting expected failure rate for the individual hardware storage devices is determined. Array parameters associated with a hardware configuration for the array of hardware storage devices with respect to each expected failure rate are determined and associated issues are detected. Reliability characteristics and associated risks of the array of hardware storage devices are determined and a functionality of the array of hardware storage devices is modified.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KYNDRYL INCONE VANDERBILT AVENUE 15TH FLOOR NEW YORK NY 10017

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Auvenshine, John J Tucson, US 53 333
Gallo, Perry J Tucson, US 6 12
Holst, Bent B Brøndby, DK 5 12
Lindstrom, Mikael Kista, SE 26 106

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 26, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 26, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00