Process for transferring microstructures to a final substrate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10899120
APP PUB NO 20190105887A1
SERIAL NO

16198952

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for transferring microstructures to a flexible or rigid final substrate that offers advantages in both speed and precision is provided. The inventive process involves subjecting a transfer film in a continuous roll-to-roll process to the following operations: either forming microstructures on, or transferring microstructures to a surface of the transfer film; and then transferring the microstructures from the transfer film onto a surface of the final substrate. The microstructures are single or multi-layer structures that are made up of: voids in a substantially planar surface, the voids optionally filled or coated with another material; raised areas in a substantially planar surface; or combinations thereof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VISUAL PHYSICS LLC1245 OLD ALPHARETTA ROAD ALPHARETTA GA 30005

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gosnell, Jonathan D Cumming, US 25 142
Jordan, Gregory R Cumming, US 32 995
Kennedy, Caroline B Winter Springs, US 4 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 26, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 26, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00