Sliding sheet and method for manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10895833
APP PUB NO 20190163102A1
SERIAL NO

15871143

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A sliding sheet includes a fabric layer is disclosed. The fabric layer includes warp yarns and weft yarns. The warp yarns are interlaced with the weft yarns. The sliding sheet has a first edge extending in a length direction of the sliding sheet. The warp yarns are bent toward a middle portion of the first edge. A method for manufacturing the sliding sheet is also disclosed. An auxiliary yarn is woven with the warp yarns and the weft yarns to form a fabric raw layer. A tension for weaving the auxiliary yarn is adjusted so that the tension of the auxiliary yarn is greater than the tension of the warp yarns, thereby bending the warp yarns in the fabric raw layer toward the auxiliary yarn. The fabric raw layer is heated to fix the shape of yarns, and cut into the fabric layer to form the sliding sheet.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHENZHEN FANCY CREATION INDUSTRIAL LIMITEDBLDG A12 BAISHIXIA LONGWANGMIAO INDUSTRIAL ZONE FUYONG ROAD EAST BAO'AN DISTRICT SHENZHEN 518103

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jin, Gang Shenzhen, CN 13 30
Yang, Mingfu Shenzhen, CN 2 129

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 19, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 19, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00