Composite article

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10895342
APP PUB NO 20190024838A1
SERIAL NO

16070109

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A composite article has an increased peel strength and includes a first layer including a low surface energy polymer. The composite article also includes a poly(meth)acrylate layer, an epoxide layer, and a polyurethane elastomer layer. The poly(meth)acrylate layer is disposed on and in direct contact with the first layer. Moreover, the poly(meth)acrylate layer includes a poly(meth)acrylate that includes the reaction product of at least one (meth)acrylate that is polymerized in the presence of an organoborane initiator. The epoxide layer is disposed on and in direct contact with the poly(meth)acrylate layer. The polyurethane elastomer layer is disposed on and in direct contact with the epoxide layer. The composite article has a 90° peel strength of at least 50 pli measured using ASTM D6862.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BASF SECARL-BOSCH-STRASSE 38 67056 LUDWIGSHAFEN AM RHEIN 67056

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dodge, Jeffrey A Plymouth, US 60 563
Jones, Charles E Berkley, US 28 791

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 19, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 19, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00