Prefabricated, prestressed bridge module

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10895047
APP PUB NO 20180135261A1
SERIAL NO

15813423

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for making a prefabricated, prestressed module includes arranging one or more steel beams atop a supporting formwork element in a direction transverse to the supporting formwork element and arranging one or more precast deck elements across the one or more steel beams to create a substantially continuous surface. The one or more precast deck elements have pockets for receiving connectors that protrude from the one or more steel beams. The method also includes arranging the supporting formwork element to allow the one or more steel beams to bend into a cambered shape to impart compressive stresses to a bottom flange of the one or more steel beams and tension stresses to a top flange of the one or more steel beams and inserting grout into the pockets to hold the cambered shape and to bond the one or more precast deck elements to the connectors and the top flange.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VALMONT INDUSTRIES INC1501 S EUCLID AVE TUCSON AS 85713

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nelson, Guy C Byron Center, US 8 35

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 19, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 19, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00