Crosslinkable composition and method for producing a coated article

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10894885
APP PUB NO 20190048203A1
SERIAL NO

16078726

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a crosslinkable composition comprising functionalized monomers comprising a crosslinkable group, a cationic group and a fluorinated group, wherein the composition comprises anions corresponding to the cationic groups of the functionalized monomers, wherein the cationic group is an N-substituted cyclic and in particular heteroaromatic group comprising a 5-membered ring and/or at least two heteroatoms and wherein a spacer which is an uncharged and unfluorinated organyl group and preferably an alkylene group is arranged between the cationic group and the fluorinated group.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AIRPLUS GMBHAEUSSERE OBERAUSTRASSE 36/4 ROSENHEIM 83026

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Andre, Maximilian Achenkirch, AT 1 2
Bechtold, Thomas Dornbirn, AT 18 26
Daxenbichler, Anna Innsbruck, AT 1 2
Kronbichler, Reinhard Ebbs, AT 1 2
Kronbichler, Simon Ebbs, AT 1 2
Naier, Benjamin Innsbruck, AT 4 3
Parti, Gabriel Innsbruck, AT 1 1
Schottenberger, Herwig Patsch, AT 7 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 19, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 19, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00