Integrated process for optimum production of para-xylene

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10894755
SERIAL NO

16592158

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of producing p-xylene comprising the steps of separating the reformate feed in the reformate splitter to produce a benzene stream, a combined heavy stream, a xylene stream, and a toluene stream, converting the C9+ aromatic hydrocarbons in the presence of a dealkylation catalyst in the dealkylation reactor to produce a dealkylation effluent, separating the dealkylation effluent in the dealkylation splitter to produce a C9 stream and a C10+ stream, reacting the C9 stream, the toluene stream, the benzene stream, and the hydrogen stream in the presence of a transalkylation catalyst in the transalkylation reactor to produce a transalkylation effluent, separating the p-xylenes from the xylene stream in the p-xylene separation unit to produce a p-xylene product and a p-xylene depleted stream, converting the m-xylene and o-xylene in the p-xylene depleted stream in the isomerization unit to produce an isomerization effluent.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANY1 EASTERN AVENUE DHAHRAN TX 31311

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abudawoud, Raed Khobar, SA 34 237
Xu, Qi Dhahran, SA 142 680
Zhang, Zhonglin Dhahran, SA 77 250

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 19, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 19, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00