Liquid supply unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10894418
APP PUB NO 20200269586A1
SERIAL NO

16066048

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A liquid supply unit includes an outer shell; a contact portion that is disposed in the outer shell and that is configured to electronically connect to the apparatus-side terminal by making contact with the apparatus-side terminal; a liquid supply port that is disposed on the outer shell and used for inserting the liquid introducing portion; and a receiving portion that extends in a protruding direction in which the guide member protrudes outward in a mounting state in which the liquid supply unit is mounted onto the liquid ejection apparatus, and that is configured to receive the guide member. At least a part of the receiving portion is located between the liquid supply port and the contact portion in a predetermined direction orthogonal to a direction in which the receiving portion extends.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEIKO EPSON CORPORATIONTOKYO 160-8801

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukasawa, Noriyuki Nagano-Ken, JP 51 288
Ishizawa, Taku Nagano-Ken, JP 226 3416
Shimizu, Yoshiaki Nagano-Ken, JP 129 1417
Shinada, Satoshi Nagano-Ken, JP 238 4939

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 19, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 19, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00