Inflatable dojo structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10888759
APP PUB NO 20180272215A1
SERIAL NO

15989486

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An inflatable device designed as a martial arts training and/or educational device. The inflatable device includes an inflatable structure and at least one interactive device connected to the inflatable structure. The inflatable structure includes a floor that is at least partially inflatable, a plurality of inflatable columns extending upwardly from the floor and a plurality of inflatable beams connected to a top or top portion of the columns. The at least one interactive device includes a target, an inflatable target, punching or kicking target, inflatable punching or kicking target, an object in the form of a person or ninja, an inflatable in the form of person or ninja, an object in the form of a person or ninja with a target, and/or an inflatable in the form of a person or ninja with a target.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHERBA INDUSTRIES INC2880 INTERSTATE PARKWAY BRUNSWICK OH 44212

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Scherba, Robert Brunswick, US 7 106

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 12, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 12, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00