Load circuit of amplifier and driver circuit for supporting multiple interface standards

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10886882
APP PUB NO 20200252037A1
SERIAL NO

16264928

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A load circuit includes a first resistive element, a first transistor and a tristate control circuit. The first transistor has a first control terminal, a first connection terminal and a second connection terminal. The first connection terminal is coupled to to one of a first amplifier output terminal and a connection node through the first resistive element. The second connection terminal is coupled to the other of the first amplifier output terminal and the connection node. The tristate control circuit has a signal output terminal coupled to the first control terminal. When the signal output terminal is in the low impedance state, the first control terminal is arranged to receive a first control signal outputted from the signal output terminal. When the signal output terminal is in the high impedance state, the first control terminal is arranged to receive a second control signal different from the first control signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
M31 TECHNOLOGY CORPORATIONHSINCHU COUNTY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Ching-Hsiang Taipei, TW 51 139

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 5, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 5, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00