Power supply circuit and control method for power supply circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10886842
SERIAL NO

16557036

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply circuit according to an embodiment includes an driver, a control circuit, and a protection circuit. The driver includes a first transistor connected between a high-potential-side power supply and a node and a second transistor connected between a low-potential-side power supply and the node. The control circuit generates, according to an output voltage to a load connected to the node via a first low-pass filter circuit, first and second switching pulses for alternately switching the first and second transistors. The protection circuit outputs, when a voltage of the node via a second low-pass filter circuit exceeds a first reference voltage, an interruption signal for making at least the first transistor nonconductive.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA TOSHIBA1-1 SHIBAURA 1-CHOME MINATO-KU TOKYO 1050023 ?1050023
TOSHIBA ELECTRONIC DEVICES & STORAGE CORPORATION1-1 SHIBAURA 1-CHOME MINATO-KU TOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hirakawa, Takuya Yokohama Kanagawa, JP 2 6
Nagasawa, Toshio Takasaki Gumma, JP 32 504

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 5, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 5, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00