Power interrupt system for a connector of a power supply device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10884074
APP PUB NO 20180238954A1
SERIAL NO

15902716

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply device includes an electrical connector and a power interrupt system. The electrical connector is configured to facilitate electrically coupling an electronic device to a power source to at least one of charge and power the electronic device. The power interrupt system selectively couples the power source to the electrical connector. The power interrupt system is configured to (a) provide energy to the electrical connector in response to at least one of (i) a first user request and (ii) a determination that the electronic device is coupled to the electrical connector, and (b) limit the energy provided to the electrical connector at least one of (i) in response to a second user request, (ii) in response to a determination that the electronic device is decoupled from the electrical connector, and (iii) after a threshold elapsed time.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GOAL ZERO LLC14864 PONY EXPRESS ROAD BLUFFDALE UT 84065

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ford, Walker Holladay, US 22 550
Howell, Henry J Herriman, US 38 912
Krantz, Norman L Draper, US 51 991
Robison, Sterling Cottonwood Heights, US 16 146
Vasefi, Keyvan Payson, US 20 215

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 5, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 5, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00