Systems and methods for ballistic impact detection and trajectory estimation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10883888
APP PUB NO 20190219459A1
SERIAL NO

16130782

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one embodiment, a sensor network is attached to a structure and employed to detect and analyze load changes such as impacts from projectiles. An analyzer coupled to the sensors can determine where on the structure the projectile impacted. Coupled with information on the origin point of the projectile, i.e. where it was fired from, the analyzer can then estimate the trajectory of the projectile. The analyzer can also determine whether the projectile passed through the structure and, if so, can extrapolate the estimated trajectory to determine an estimation of whether the projectile has also impacted an object behind the structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ACELLENT TECHNOLOGIES INC835 STEWART DRIVE SUNNYVALE CA 94085

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bergman, Jeffrey Dean Santa Clara, US 4 1
Chang, Fu-Kuo Stanford, US 28 472
Chang, Grant Jin-Hau Stanford, US 1 0
Li, Franklin J Palo Alto, US 1 0
Li, Irene Jhi-Sue Stanford, US 2 4
Yadav, Susheel Kumar Santa Clara, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 5, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 5, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00