Multi-fluid heat exchanger

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10883767
APP PUB NO 20190331427A1
SERIAL NO

16310729

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-fluid heat exchanger (100) includes a primary section (102) and a secondary section (104) arranged contiguous with the primary section (102). The multi-fluid heat exchanger (100) further includes a first heat transfer channel (106) arranged to carry a first fluid (118) and the first heat transfer channel (106) extends between the primary section (102) and the secondary section (104) and carries the first fluid (118) between the sections (102,104). The multi-fluid heat exchanger (100) also includes a second heat transfer channel (108) disposed only at the primary section (102) and arranged to carry a second fluid (114) for heat exchange between the first and second fluids (112,114) at the primary section (102) and a third heat transfer channel (110) disposed only at the secondary section (104) and arranged to carry a third fluid (116) for heat exchange between the first and third fluids (112,116) at the secondary section (104).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NATIONAL UNIVERSITY OF SINGAPORESINGAPORE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Poh Seng Singapore, SG 14 48
Sun, Chuan Singapore, SG 18 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 5, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 5, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00