Energy saving boiler system of steam supply

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10883713
APP PUB NO 20180209638A1
SERIAL NO

15746276

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An energy-saving gas supply boiler system, comprising: a steam boiler, a flue gas pipeline, a heat exchanger, a steam generator and an ejector. The steam boiler comprises a body, a combusting apparatus, a flue gas outlet, a water outlet and a high pressure steam outlet. The heat exchanger comprises a high temperature flue gas inlet, a medium temperature flue gas outlet, a cooling water inlet and a hot water outlet. Cooling water undergoes heat exchange with flue gas and flows out from the hot water outlet. The steam generator comprises a generator body, a hot water inlet and a low pressure steam outlet. The ejector comprises a high pressure steam inlet, a mixing steam outlet and a low pressure steam inlet. The high pressure steam inlet delivers high pressure steam to the ejector. The low pressure steam inlet delivers low pressure steam to the ejector.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GUANGDONG UNIVERSITY OF TECHNOLOGYNO 100 WAIHUAN WEST ROAD UNIVERSITY TOWN GUANGZHOU GUANGDONG 510062 GUANGZHOU CITY GUANGDONG PROVINCE 510062

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liu, Wenxing Guangzhou, CN 5 2
Liu, Xiaozhou Guangzhou, CN 19 3
Zhang, Yu Guangzhou, CN 1971 9206

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 5, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 5, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00