Combined cycle plant, method for reducing minimum output thereof, and control device therefor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10883389
APP PUB NO 20190040766A1
SERIAL NO

16076567

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control device includes a reception unit configured to receive a load schedule indicating a load in the future of a combined cycle plant, a steam temperature control unit configured to control a temperature of steam flowing into a steam turbine, and a fuel control unit configured to control a flow rate of fuel supplied to a gas turbine. The steam temperature control unit is configured to output a command indicating an amount of operation for decreasing the temperature of the steam to a steam temperature regulator prior to a load decrease time at which the load is to be decreased in the load schedule.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI POWER LTD2-3 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 1008332 ?1008332

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kubota, Atsushi Yokohama, JP 142 1555

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 5, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 5, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00