Light control film and vehicle body panel including the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10877345
SERIAL NO

16667129

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A light control film to be bonded to a panel member for a vehicle includes film substrates, conductive layers, and a liquid crystal layer. The conductive layers are on surfaces of the film substrates opposed to each other, respectively. The liquid crystal layer is sandwiched between conductive layers. The light control film is switchable between a first state with a first haze percentage and a second state with a second haze percentage that is lower than the first haze percentage. Each film substrate includes at least an acrylic imide layer made of acrylic imide. Each conductive layer includes a thin silver film or a copper wire mesh.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TDK CORPORATIONTOKYO 103-8272
TOYOTA BOSHOKU KABUSHIKI KAISHAJAPAN
RIKEN TECHNOS CORPORATION101 KANDA-AWAJICHO 2-CHOME CHIYODA-KU TOKYO 1018336 ?1018336

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harada, Shouhei Tokyo, JP 6 0
Irie, Masahiro Aichi-ken, JP 32 310
Kobayashi, Kanji Gifu-ken, JP 17 141
Mishima, Koji Tokyo, JP 142 1566
Okamoto, Kenji Aichi-ken, JP 268 4270
Washio, Nozomu Tokyo, JP 19 53
Yamada, Kazushi Tokyo, JP 4 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 29, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 29, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00