Methods and systems for generating wind turbine control schedules

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10871146
APP PUB NO 20180180025A1
SERIAL NO

15738183

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of generating a control schedule for a wind turbine is provided, the control schedule indicating how the turbine maximum power level varies over time, the method comprising: receiving input indicative of the maximum number of times that each of one or more turbine components are to be replaced over the remaining lifetime of the turbine; determining a value indicative of the current remaining fatigue lifetime of the turbine, or one or more of the turbine components, based on measured wind turbine site and/or operating data; and varying a parameter of an initial predefined control schedule that specifies how the turbine maximum power level varies over time. The varying is performed by: (i) adjusting the parameter of the initial predefined control schedule; (ii) estimating the future fatigue lifetime consumed by the wind turbine, or one or more turbine components, over the duration of the varied control schedule, based upon the varied control schedule and accounting for the replacements of the one or more turbine components; and (iii) repeating steps (i) and (ii) until the estimated future fatigue lifetime consumed by the wind turbine or each of the one or more turbine components is sufficient to allow a target minimum wind turbine life to be reached.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • VESTAS WIND SYSTEMS A/S

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hales, Kelvin Surrey, GB 15 146
Spruce, Chris Leatherhead, GB 30 377
Turner, Judith Dorking, GB 8 146

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 22, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00