Stabbing-proof composite structure, method of manufacturing a composite structure, stabbing-proof insert, and protective textile

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10869513
APP PUB NO 20190191798A1
SERIAL NO

15999602

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A composite structure for stab protection includes layers of flat structures placed on top of each other, and an embedding material, wherein, in at least some of the layers placed on top of each other, the flat structures of adjacent layers are offset relative to one another, the flat structures of the composite structure are at least partially embedded in the embedding material, and the composite structure includes separated connecting elements, wherein before they are separated, the separated connecting elements have connected at least some of the flat structures of adjacent layers with one another.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DEUTSCHE INSTITUTE FUR TEXTIL-UND FASERFORSCHUNG DENKENDORFKORSCHTALSTRASSE 26 DENKENDORF 73770
W + R GMBHCARL-ZEISS-STRASSE 5 METZINGEN 72555

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Junger, Hannes Metzingen, DE 1 0
Scherrieble, Andreas Ludwigsburg, DE 2 0
Stegmaier, Thomas Owen, DE 7 45

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 22, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00