Prestressed assembled concrete frame-joint connecting structure and constructing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10865557
SERIAL NO

16724332

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to the technical field of assembled concrete frame structures, and discloses a prestressed assembled concrete frame-joint connecting structure and constructing method thereof. The present disclosure includes a prefabricated concrete column, a prefabricated concrete superposed beam, a composite slab, a post-tensioned prestressing tendon that connects the prefabricated concrete column and the prefabricated concrete superposed beam, a bending-resistant energy consuming steel bar and a shearing-resistant high-strength steel bar.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LTD100037 BEIJING HAIDIAN DISTRICT LI RIVER ROAD NO THREE NO 15 MUNICIPAL DISTRICT BEIJING CITY 100037

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fan, Xin Beijing, CN 65 740
Geng, Jiao Beijing, CN 4 11
Guo, Haishan Beijing, CN 5 22
Hou, Xueying Beijing, CN 31 90
Jiang, Lihong Beijing, CN 7 15
Li, Liming Beijing, CN 24 204
Li, Ming Beijing, CN 1285 14101
Li, Tong Beijing, CN 171 724
Liu, Kang Beijing, CN 34 279
Qi, Hu Beijing, CN 6 22
Tian, Lida Beijing, CN 3 11
Wang, Dongyan Beijing, CN 61 2521
Yang, Xiaojie Beijing, CN 6 22
Zeng, Tao Beijing, CN 88 408
Zhang, Haitao Beijing, CN 173 1178

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 15, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 15, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00