Split vise

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10864615
SERIAL NO

16227000

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments described herein relate to a vise, for example, for holding material to be cut with a saw, for example, power saw. In one embodiment the disclosed vise includes a base member, a pair of fixed jaws attached to a first side of the base member, the pair of fixed jaws being substantially aligned and spaced apart defining a first gap therebetween, a handle attached to a second side of the base opposite the first side, and a pair of moveable jaws adjustably connected to the pair of fixed jaws, the pair of moveable jaws being spaced apart defining a second gap therebetween, wherein a center of the second gap is substantially aligned with a center of the first gap.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA MOTOR ENGINEERING & MANUFACTURING NORTH AMERICA INC6565 HEADQUARTERS DRIVE W1-3C PLANO TX 75024

International Classification(s)

loading....
  • 2018 Application Filing Year
  • B25B Class
  • 867 Applications Filed
  • 621 Patents Issued To-Date
  • 71.63 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances201820192020202120222023202420250255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ceniza, Rommel B Guelph, CA 5 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • B25B Class
  • 0 % this patent is cited more than
  • 5 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges2993689101 - 1011 - 2051 - 600100200300400255075125150175225250275325350375

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 15, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 15, 2032