Group of cells for power adaptation of electrochemical reactors

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10862150
APP PUB NO 20190221873A1
SERIAL NO

16243275

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An assembly of electrochemical cells for an electrochemical reactor, including a first electrochemical cell, including a first membrane/electrode assembly including a first anode and a first cathode on either side of a proton exchange membrane; first and second flow guides positioned on either side of the first assembly; a second electrochemical cell, including a second membrane/electrode assembly including a second anode and a second cathode on either side of a proton exchange membrane; third and fourth flow guides on either side of the second membrane/electrode assembly; the first and third flow guides have one and the same geometry; the first anode and the second anode have different distributions of surface densities of electrocatalytic material on respective faces of the first and second proton exchange membranes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COMMISSARIAT A L'ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVESPARIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Poirot-Crouvezier, Jean-Philippe Saint Georges de Commiers, FR 43 51

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 8, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 8, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00