Engine fuel injection control device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10859028
APP PUB NO 20190055896A1
SERIAL NO

15763209

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a fuel injection control device for an engine equipped with a solenoid-type fuel injector 67. The fuel injection control device comprises: a voltage sensor SW19 configured to detect a voltage of a solenoid of the fuel injector 67; and a PCM 10 configured to set a valve-open period of the fuel injector 67, based on a fuel injection amount according to an operation state of the engine 1, and control the fuel injector 67 based on the valve-open period. The PCM 10 is configured to perform correction for gradually shortening the set valve-open period, as the voltage (residual voltage) detected by the voltage sensor SW19 when opening the fuel injector becomes larger, and control the fuel injector 67 based on the corrected valve-open period.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAZDA MOTOR CORPORATION3-1 SHINCHI FUCHU-CHO AKI-GUN HIROSHIMA 735-8670

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Horiuchi, Hiroaki Hiroshima, JP 6 22
Nakagawa, Shigeru Hiroshima, JP 55 1055
Shintani, Shuhei Hiroshima, JP 2 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 8, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 8, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00