Triboelectric energy generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10855205
APP PUB NO 20180091064A1
SERIAL NO

15562924

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention provides an energy generation and/or conversion system and method wherein an electrical power generator is controlled to periodically alternate between a contact-mode, during which elements of the generator are brought into contact to induce a state of charging, and a non-contact mode, during which plates of the generator are separated from one another and electrical energy is generated through electrostatic induction. Timing and duration of contact and non-contact modes are controlled by a controller, or by user commands, in dependence on a charge state of the elements of the generator: In this way elements are controlled to come into contact only when surface charge has fallen below a certain level, and re-charging is necessary; contact time between the elements may hence be minimised—thereby minimising incurred noise and surface wear—whilst still maintaining a given desired threshold power output.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KONINKLIJKE PHILIPS N VHOLLAND IAN DEHO FINN EINDHOVEN NORTH BRABANT

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Davie, Alan James Cambridge, GB 17 259
Franklin, Steven Ernest Eindhoven, NL 14 97
Gerhardt, Lutz Christian Eindhoven, NL 66 70
Johnson, Mark Thomas Eindhoven, NL 485 4522
Joye, Neil Francis Waalre, NL 28 250
Rutgers, Andrew Ulrich Eindhoven, NL 13 154

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00