Heating and hot water supply apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10852036
APP PUB NO 20190032959A1
SERIAL NO

16032082

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A distribution valve controls a distribution ratio of a heat transfer medium between a hot water supply path including a heat exchanger for hot water supply and a beating circulation path through which the heat transfer medium is supplied to a heating terminal. A bypass flow rate control valve controls a bypass ratio which is a ratio of a flow rate of low temperature water introduced into a bypass pipe that bypasses the heat exchanger for hot water supply to a flow rate of low temperature water introduced into a water inlet pipe. The bypass ratio is regulated so that a hot water temperature detected by a temperature sensor reaches a hot water target temperature. During a simultaneous operation of hot water supply and heating, the distribution valve is controlled so that, when a bypass ratio is low, a distribution ratio is higher than when a bypass ratio is high.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NORITZ CORPORATION93 EDOMACHI CHUO-KU KOBE-SHI HYOGO 650-0033

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Atobe, Yoshifumi Hyogo, JP 7 14
Morimoto, Hiroshi Hyogo, JP 149 1047
Tsuda, Naoki Hyogo, JP 27 57

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00