Rotor of rotating electric machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10848028
APP PUB NO 20180248436A1
SERIAL NO

15754306

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A detachment prevention portion extending in a circumferential direction of a flange portion of a bobbin from a neck portion of a locking portion provided so as to extend radially outward from the flange portion is formed such that a length by which the detachment prevention portion extends to one side in the circumferential direction is longer than a length by which the detachment prevention portion extends to another side in the circumferential direction. Accordingly, interference between cover portions and a field coil winding or between the cover portions and a winding jig for the winding during operation of winding a lead wire of the winding can be inhibited while electric insulation between a field coil and claw-shaped magnetic poles is ensured.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 1008310 ?1008310

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Imazawa, Yoshiro Tokyo, JP 18 66
Maekawa, Kenji Tokyo, JP 9 286
Shimizu, Shintaro Tokyo, JP 10 65
Shinosaka, Yoshihiro Tokyo, JP 16 77

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 24, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 24, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00