Steam power generating system with injection feedwater heater

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10845049
SERIAL NO

16051435

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A steam power generating system includes at least one steam generator, at least one turbine assembly, at least one electric generator, at least one condenser and a feedwater preheat arrangement including at least one injection feedwater heater connected to the condenser and the turbine assembly. The injection feedwater heater includes a main heater body and at least one injection nozzle. A predetermined amount of condensate water from the condenser is arranged to be pumped into the main heater body. The condensate water passing through the water inlet is arranged to be injected into a heat exchange compartment through the injection nozzle for creating a negative pressure in the heat exchange compartment. The negative pressure draws a predetermined amount of steam from the turbine assembly to enter the heat exchange compartment for mixing with the condensate water.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GU XUEDONGANAHEIM CA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gu, Xuedong Anaheim, US 2 0
Tong, MingWei ChongQing, CN 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 24, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 24, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00