Method for treating a hydrocarbon feedstock comprising a deasphalting step and an asphalt conditioning step

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10844291
APP PUB NO 20190161687A1
SERIAL NO

16314162

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a process for treating a hydrocarbon-based feedstock, comprising a) a step of extracting the feedstock, b) a step of separating the fraction comprising de-asphalted oil, c) an optional step of injecting a withdrawal flux into the fraction comprising asphalt, d) an optional step of separating the fraction comprising asphalt and solvent or solvent mixture obtained from the extraction step a), e) an optional step of injecting a withdrawal flux into the asphalt fraction alone or as a mixture with a withdrawal flux obtained from step d) and an integrated step of conditioning the asphalt fraction obtained from steps a) and/or c) and/or d) and/or e), in solid form, performed in successive or simultaneous substeps.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IFP ENERGIES NOUVELLESFRANCE RUEZ - MA MAISON RUEIL-MALMAISON HAUTS-DE-SEINE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Le, Coz Jean-Francois Saint Germain en Laye, FR 18 40
Weiss, Wilfried Valencin, FR 61 909

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 24, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 24, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00