Process for producing wood-based OSBs having reduced emission of volatile organic compounds (VOCs)

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10843375
APP PUB NO 20190070747A1
SERIAL NO

16108797

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for treating wood strands suitable for producing OSBs includes treating the wood strands in water at a temperature in the range from 50° C. to 100° C. The present invention likewise relates to a process for producing wood-based OSBs, in particular wood-based OSBs having reduced emission of volatile organic compounds (VOCs), including: a) production of wood strands from suitable timbers; b) treatment of at least part of the wood strands with water; c) drying of the wood strands which have been treated with the water; d) coating of the wood strands which have been treated with water and dried and coating of wood strands which have not been treated with water with at least one binder; e) scattering of the glue-coated wood strands on a conveyor belt; and f) pressing of the glue-coated wood strands to give a wood-based OSB.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SWISS KRONO TEC AGMUSEGGSTRASSE 14 6004 LUZERN 6004

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kalwa, Norbert Horn-Bad Meinberg, DE 75 328
Pfeiffer, Sabrina Kyritz, DE 11 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 24, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 24, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00