Method of making a laminated wood product

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10843371
APP PUB NO 20190275698A1
SERIAL NO

16345440

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to a method of producing a laminated wood product, comprising providing a plank presenting a pair of parallel major surfaces, a pair of minor surfaces, a pair of end surfaces and a longitudinal direction parallel with said major and minor surfaces and perpendicular to the end surfaces, said plank having a water content of more than 25% by weight, preferably more than 30% by weight, initializing at least one longitudinal crack in the plank, drying said crack initialized plank to a moisture content of less than 20% by weight, and laminating said crack initialized plank by gluing at least one of its major surfaces to a surface of a second member, thus forming the laminated wood product. The disclosure also relates to a laminated wood product, which may be formed according to the method.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STORA ENSO OYJP O BOX 309 HELSINKI 00101

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hirmke, Markus Rossatz-Arnsdorf, AT 6 6
Kirchmayr, Hermann Lilienfeld, AT 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 24, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 24, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00