Automotive rotary electric machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10840752
APP PUB NO 20180342915A1
SERIAL NO

15795382

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

First side surfaces 22bb of first magnetic pole portions 22b and second side surfaces 23bb of second magnetic pole portions 23b that face each other in a circumferential direction are configured into parallel flat surfaces, first circumferentially tapered portions 25b are formed on circumferential shoulder portions of the first magnetic pole portions 22b, second circumferentially tapered portions 26b are formed on circumferential shoulder portions of the second magnetic pole portions 23b, and portions of the first and second circumferentially tapered portions 25b and 26b enter a region 24 in which the first side surfaces 22bb and the second side surfaces 23bb that face each other in the circumferential direction overlap when viewed from a direction that is perpendicular to the first side surfaces 22bb and the second side surfaces 23bb.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 1008310 ?1008310

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Imazawa, Yoshiro Tokyo, JP 18 66
Uesato, Yuki Tokyo, JP 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 17, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 17, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00