Systems and methods for packaging a solid-state battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10840483
SERIAL NO

16165131

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to systems and methods for packaging a solid-state battery. Consistent with some embodiments, a package for a solid-state battery includes a substrate, a cap disposed over the substrate and forming an enclosure with the substrate, and a solid-state battery disposed inside the enclosure. The solid-state battery includes a first electrode that is disposed over the substrate, an electrolyte that is disposed over the first electrode, and a second electrode that is disposed over the electrolyte. The package further includes a compressible component disposed inside the enclosure and between the cap and the second electrode of the solid-state battery. The compressible component applies a pressure to at least one of the electrodes of the solid-state battery in a direction substantially perpendicular to the electrode(s) of the solid-state battery.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VERILY LIFE SCIENCES LLCDALLAS TX 75019

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Etzkorn, James Mountain View, US 65 1025
Shah, Kedar San Francisco, US 18 111

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 17, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 17, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00