Process for producing water-absorbing resin particles

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10835887
APP PUB NO 20190030512A1
SERIAL NO

16080998

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a method for producing water-absorbent resin particles that has a low stirring load, and can produce water-absorbent resin particles having a particle diameter within a specific range, with high productivity. The method for producing water-absorbent resin particles comprises adding an ethylenically unsaturated monomer all at once to a hydrocarbon dispersion medium mixed with a surfactant to perform reversed phase suspension polymerization, wherein the reversed phase suspension polymerization is performed in one step, or two or more steps, the surfactant is at least one selected from the group consisting of polyoxyethylene alkyl ether phosphates, alkali metal salts of polyoxyethylene alkyl ether phosphates, and alkaline earth metal salts of polyoxyethylene alkyl ether phosphates, and the surfactant has an HLB of 9 to 15.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO SEIKA CHEMICALS CO LTD346-1 MIYANISHI HARIMA-CHO KAKO-GUN HYOGO 675-0145

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hama, Maoki Himeji, JP 7 4
Isokawa, Sho Himeji, JP 2 1
Kumazawa, Kenta Himeji, JP 4 2
Takagi, Koji Himeji, JP 45 2455

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 17, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 17, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00