Composite article

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10830387
APP PUB NO 20190024840A1
SERIAL NO

16070087

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A composite article is formed by disposing a poly(meth)acrylate layer, formed as the reaction product of at least one acrylate that is polymerized in the presence of an organoborane initiator, on and in direct contact with a low surface energy polymer layer, disposing an epoxide layer on and in direct contact with said poly(meth)acrylate layer, and disposing a hydrolytically resistant layer on and in direct contact with said epoxide layer. The hydrolytically resistant layer is a hydrolytically resistant polyurethane elastomer that is the reaction product of an aliphatic isocyanate component and an isocyanate-reactive component that retains at least 90% of its initial tensile strength after submersion in standardized seawater for 24 weeks. The isocyanate-reactive component is a hydroxyl-functional polymer having an average hydroxy functionality ranging from 2 to 3, wherein the hydroxyl-functional polymer is a dimer diol, a trimer triol, or a combination thereof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BASF SECARL-BOSCH-STRASSE 38 67056 LUDWIGSHAFEN AM RHEIN 67056

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dodge, Jeffrey A Plymouth, US 60 563

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 10, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 10, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00