System and method for determining and controlling engine speeds during gear shifting

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10823287
APP PUB NO 20200103025A1
SERIAL NO

16145932

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for determining and controlling engine speeds of a work vehicle during gear shifts may include controlling an operation of an engine and/or a transmission of a work vehicle so as to maintain the work vehicle operating at a requested speed, and determining a measured gear ratio for the transmission as a gear shift is occurring from a first gear ratio to a second gear ratio. The method may also include calculating a desired engine speed during the gear shift as a function of the requested speed and either the measured gear ratio or the second gear ratio. In addition, when the measured gear ratio differs from the first gear ratio by a predetermined threshold amount, the method may include controlling the engine speed based on the desired engine speed for a remainder of the gear shift from the first gear ratio to the second gear ratio.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BLUE LEAF I P INC1105 NORTH MARKET STREET SUITE 912 WILMINGTON DE 19801

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bulgrien, Garth Harvey Ephrata, US 15 46
Hartman, Brian A Valparaiso, US 18 253
Omran, Ashraf Chicago, US 9 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 3, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 3, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00