Frequency control for a frequency generator of an ion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10823157
APP PUB NO 20180283365A1
SERIAL NO

15898892

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control device includes an acquiring unit and a processing unit. The acquiring unit acquires a voltage course and a current course of a determinable number of periods of a frequency generator and transmits these to the processing unit. The processing unit determines a temporal offset Δt1 between a rising edge of the current course and a rising edge of the voltage course for each period of the determinable number of periods, and further determines if this temporal offset Δt1 is positive or negative. The processing unit determines a difference between the number of periods with positive temporal offset and the number of periods with negative temporal offset within the determinable number of periods, and generates and adapts a switching signal for a switch-on time of the voltage course if the number of periods with positive temporal offset differs from the number of periods with negative temporal offset.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TESAT-SPACECOM GMBH & CO. KG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
John, Frederik Bruchsal, DE 2 1
Lampe, Alexander Aspach, DE 12 79

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 3, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 3, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00